Blasting powder factor formula
WebPowder Factor is defined as the amount of explosive required to dislodge and fragment 1 cubic yard of rock. [3] The softer (less dense) the material that is being blasted; the smaller the powder factor. ... After calculating the BI for a blasting area, we can determine the needed powder factor from an empirical chart. [4] Example: For a ... WebSep 16, 2007 · PDF On Sep 16, 2007, Hossein Nezamabadi-pour and others published Determination of Powder Factor for an Optimize d Blast Pattern Design Using Artificial …
Blasting powder factor formula
Did you know?
WebMar 1, 2015 · The pre-splitting holes aim to extract the rock mass in order to create a smooth face. Hence, their powder factor is defined as the amount of explosive used to create a square meter of a smooth ... WebMar 14, 2024 · Introduction: Blasting is a process of breaking down rocks into smaller pieces, which can be transported easily. It is widely used in mining, quarrying, and construction industries. Blasting requires careful planning and calculations to ensure that it is done safely and efficiently. One of the critical aspects of blasting is calculating the …
WebSep 20, 2015 · The burden and spacing values are either 1.5 m or 2 m for a given blast design.The quarry’s blasting patternsgivespowder factor that ranges between 0.625 – 0750kg/m2 .However, when the ... WebJan 4, 2024 · Blasting with the aim to reduce oversize boulders in underground has many hurdles due to limited accessibilities and poor site conditions. Optimized drilling and blasting parameters can help to achieve this objective. The major challenges of the blast designers lie within deciding blast geometry, namely drill hole diameter, burden, and …
WebCalculate the powder factor for this blast. State any assumptions made. Question 2 A 30 m bench is required to be blasted for a large face shovel. The hole diameter is 270 mm and stemming is set to 20 times the hole . diameter. The burden has been set to 8.0 m and the spacing set to 9.0 m to . WebHere crater blasting technology is used for drop - raising in which lifts are blasted according to crater theory. Multiple blasts are required with this method. It is safer than the Alimak type of raising and cheaper and faster than raise-boring. ... powder factor reduction should be considered from the standpoint that adjacent detonating ...
WebMar 10, 2014 · See answer (1) Copy. Net explosives weight is used to calculate Quantity Distance by means of a formula D = K*W1/3, where "D" is the distance in feet, "K" is a factor (also called K-factor) that ...
http://www.iring.ca/_Knowledgebase/module_6_2.html tpddl noc formatWebJan 11, 2024 · where Q is the blast hole charge amount, kg; q is the powder factor, kg/m 3; a is the spacing, m; w is the burden, m; ... From the above calculation formula of … thermory cutekWebJun 24, 2024 · ‘The blast design calculator utilizes user inputs – including burden, spacing, stemming height, sub-drill, hole diameter, bench height and explosive type – to determine explosive loads, powder factors and other outputs. ... The quick calculator includes a BME in-house formula for the target powder factor, as well as calculations related ... thermory cladding detailsWebNov 23, 2016 · Specific charge is one of the important parameters of bench blasting. The specific charge or powder factor varies between 0.1 and 0.7 kg/m 3 for normal bench blasting. The value is affected by the following factors: The blastability of rock blasted. Tables 5.1, 5.2, and 5.6 of Chap. 5 have shown the relationship between the powder … tpddl online appointmentWebThe chart is based on the use of a dry ANFO. If a more energetic blasting agent or explosive is used, the chart will overestimate the amount of powder that can be fired at one time. The USBM field sites were … thermory distributorsWebMissouri University of Science and Technology tpddl pole shiftingWebPower factor is expressed as pounds of explosive per cu-bic yard of rock and is depth dependent. Cubic yardage is calculated: Burden (ft) x Spacing (ft) x Hole Depth (ft) (not including subdrill) ÷ 27 • Trench depths of 4’ to 12’: powder factor = 3.5 • Trench depths of 12’ to 20’: powder factor = 4.0 tpddl offer